Selecta One 2025

CROP TIME FROM ROOTED CUTTING/PLANTS PER POT (PPD)

4- to 5-inch (10- to 13-cm) Pots, Quarts

10- to 12-inch (25- to 30-cm) Tubs or Baskets

Plant Growth Regulators (PGR) (S) = spray / (D) = drench

Pests and Fungal Diseases

6-inch (15-cm) Pots, Gallons

Comments

Aphids, Sclerotinium

7 to 10 weeks 1 ppp 10 to 14 weeks

(varies seasonally) 3 ppp

Aphids, Sclerotinium

7 to 10 weeks 1 ppp 10 to 14 weeks

(varies seasonally) 3 ppp

5 to 7 weeks,

7 to 9 weeks,

8 to 10 weeks,

Thrips, Aphids, Botrytis, Pythium

Cool temperatures and high light levels will improve plant quality. Pinch as needed for improved plant habit. Watch for Fe deficiency.

B-Nine 750-1,500 PPM (S), Sumagic 5-10 PPM (S)/ Sumagic 0.25 PPM (D)

1 ppp

2 ppp

4 to 5 ppp

5 to 7 weeks,

6 to 8 weeks,

6 to 9 weeks,

Pinch as needed for improved plant habit. Let media dry out between watering.

Thrips, Aphids, Spider Mites, Botrytis, Pythium

B-Nine 2,500 PPM (S), Sumagic 3-5 PPM (S)/ Sumagic 0.25 PPM (D)

1 ppp

1 to 2 ppp

4 to 5 ppp

Sumagic 5-10 PPM (S), Bonzi 10-20 PPM (S)

Aphids, White Fly, Pythium

Cool temperatures and high light levels will improve plant quality.

6 to 7 weeks,

7 to 8 weeks,

8 to 10 weeks,

1 ppp

2 ppp

4 ppp (Mohave™ Basket Yellow)

8 to 10 weeks,

10 to 12 weeks,

13 to 15 weeks,

none

Spider Mites

Provide cool temperatures and short days during bulking period. Provide long days (night interrupt) and cool to moderate temperatures for flower induction.

1 ppp

1 ppp

3 ppp

5 to 7 weeks,

7 to 9 weeks,

10 to 14 weeks,

B-Nine 1,500 PPM (S), Bonzi 1 PPM (D)

Thielaviopsis, Powdery Mildew, Aphids, Mites

1 ppp

1 ppp

3 to 4 ppp

7 to 8 weeks,

7 to 11 weeks,

9 to 12 weeks,

Start Calibrachoa warm. After side shoots have developed, cool temperatures and high light levels will improve plant quality. Watch for Fe deficiency.

Powdery Mildew, Pythium, Thielaviopsis, TMV, Aphids, Fungus Gnats, Thrips

B-Nine 2,500-3,500 PPM (S), Sumagic 10-20 PPM (S)/Sumagic 0.25 PPM (D), Bonzi 1-2 PPM (D)

1 ppp

1 to 2 ppp

4 to 5 ppp

5 to 7 weeks,

7 to 9 weeks,

10 to 14 weeks,

B-Nine 1,500 PPM (S), Bonzi 1 PPM (D)

Thielaviopsis, Powdery Mildew, Aphids, Mites

1 ppp

1 ppp

3 to 4 ppp

none

Aphids, Mites, Thrips, Botrytis

5 to 6 weeks,

6 to 8 weeks,

10 to 12 weeks,

1 ppp

1 to 3 ppp

3 to 5 ppp

5 to 7 weeks,

7 to 9 weeks,

10 to 14 weeks,

Pythium, Botrytis, Aphids, Thrips, Spider Mites, Mites, Root Rot, Powdery Mildew Phytophthora, Powdery Mildew, Botrytis, Pythium, Aphids, Leafminer, Spider Mites, Thrips Thrips, Leafminers, Aphids, Botrytis

B-Nine 2,500 PPM (S), B-Nine 1,000 PPM (S)/ Cycocel 500 PPM (S) tank mix, Bonzi 2 to 4 PPM (D)

1 ppp

1 ppp

3 to 4 ppp

Night-break lighting will reduce likelihood of tuber formation.

6 to 8 weeks,

7 to 9 weeks,

B-Nine 2,500-4,000 PPM (S), Cycocel 1,000-1,500 PPM tank mix (S)

1 ppp

1 to 2 ppp

6 to 8 weeks,

7 to 9 weeks,

10 to 12 weeks,

Night-break or extended day lighting during early Spring (natural short days) will help prevent tuber formation.

B-Nine 1,500-2,500 PPM (S), B-Nine 1,500 PPM (S)/ Cycocel 750 PPM (S) tank mix, Bonzi 2-4 PPM (D)

1 ppp

1 ppp

3 to 4 ppp

5 Temperature needs day/night: During rooting, keep soil temperature measured in the liner at 70°F/21°C until cuttings are well-rooted. After planting the liner, keep temperature up until roots have developed nicely. Afterward, follow recommendations. The use of “Cool Morning“ treatments will improve plant quality, flower and foliage color, and plant habit, and harden the plants. Lower the temperature by 8 to 12°F/-13 to -11°C 2 hours before sunrise until 2-3 hours after sunrise. Start treatments after plants are rooted in, well-branched and cover the media (reach the pot edges). To avoid delayed flowering, keep the average day temperature under a close watch and if necessary, increase night temperatures. Finishing of the crop depends on the average day temperature, and positive or negative DIF methods as well as “Cool Morning” can be used to improve plant quality.

SelectaNorthAmerica.com or 800 879-2255

FINISHING GUIDE | 133

Powered by